Reference Projects

MOB Vacuum Chamber for ELI Beamlines CZ​

The MOB vacuum chamber is used for beam entry into the experimental chamber P3. The chamber was completely cleaned and assembled in the ISO 6 clean room and then subjected to an RGA test.​

Project Details:​

  • Two optical tables above each other with total usable space of 14.5 m2
  • Deflection, stresses and natural frequencies optimised using FEM simulation​
  • Granite blocks with stainless steel supports as a stable foundation​
  • Excellent stability of the chamber and optical table​
  • Multiple access ports accurately machined after welding​
  • Final successful RGA cleanliness measurement